Thursday
Aug192021
TROUBLED SCRAM AT PT. BEACH: Physicians' group requests NRC action


PSR WI expert Arnie Gundersen, Chief Engineer at Fairewinds Associates, analyzed the trip, identifying four separate problems, focusing on aging-related degradation aspects of the root cause. PSR WI has requested an NRC Augmented Inspection Team to examine the incident. At the same time, Nukewatch Wisconsin's John LaForge has documented that emergency sirens have been turned off at the plant. We are honored to advise PSR WI.
