Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE
« Kucinich weighs in on NRC OIG investigation of Ostendorff | Main | Kucinich demands OIG investigation of NRC's two-faced "snow job" on Davis-Besse's cracked containment »
Friday
Aug172012

Crack contention against Davis-Besse 20-year extension bolstered by NRC FOIA revelations

At the reactor's front gate, "Homer Simpson and Humpty Dumpty act out" FENOC's "Blizzard of '78" snow job explanation for how/when/why Davis-Besse's concrete containment shield building cracked. This street theater was held in solidarity with the SAGE Alliance's day of action to shut down Vermont Yankee, and protested FENOC's Feb. 28th "root cause report."The environmental coalition challenging FirstEnergy Nuclear Operating Company's (FENOC) proposed 20-year license extension at the problem-plagued Davis-Besse atomic reactor, near Toledo on the Lake Erie shore, has bolstered its contention on the severe shield building cracking by citingU.S. Nuclear Regulatory Commission (NRC) documents revealed through a Freedom of Information Act (FOIA) request submitted by Beyond Nuclear. The coalition has issued a media release about its latest contention supplementation.

Toledo attorney Terry Lodge filed this FOIA supplement, the coalition's fifth this year, since filing the original contention on January 10th, just five days after the environmental intervenors confronted NRC and FENOC about the cracking at a special public meeting at Camp Perry, OH. The others include: (1) a Feb. 27th filing, based on U.S. Rep. Kucinich's (D-OH) revelation that the shield building's outer rebar layer was no longer structurally functional, due to the cracking; (2) a June 4th filing, in response to FENOC's woefully inadequate Aging Management Plan (AMP) for the shield building's cracks; (3) a July 16th filing, in response to FENOC's revised root cause analysis report, which revealed that shield building cracking was first observed not in October 2011, but rather August 1976; (4) a July 23rd filing, based on revelations in FENOC contractor Performance Improvement International's revised root cause assessment report, which revealed 27 areas of skeptical NRC questioning about FENOC's "Blizzard of 1978" theory of shield building cracking (the environmental Intervenors also posted documents supportive of its fourth supplement). The environmental coalition also defended its crack contention, on February 14th, against challenges by NRC staff and FENOC.

Beyond Nuclear has prepared a report, entitled "What Humpty Dumpty Doesn't Want You to Know: Davis-Besse's Cracked Containment Snow Job," which summarizes the coalition's work in 2012 on Davis-Besse's dangerously degraded condition.