NRC

The U.S. Nuclear Regulatory Commission is mandated by Congress to ensure that the nuclear industry is safe. Instead, the NRC routinely puts the nuclear industry's financial needs ahead of public safety. Beyond Nuclear has called for Congressional investigation of this ineffective lapdog agency that needlessly gambles with American lives to protect nuclear industry profits.

.................................................................................................................................................................................................................

Entries from November 1, 2014 - November 30, 2014

Monday
Nov172014

Outgoing NRC Chairman Allison Macfarlane speaks at National Press Club

Outgoing NRC Chairman Allison MacfarlaneOn Nov. 17th, outgoing U.S. Nuclear Regulatory Commission (NRC) Chairman Allison Macfarlane (photo, left) spoke, and answered questions, at the National Press Club (NPC) in Washington, D.C. A video recording of the address, and Q&A session, is posted on the NPC website.

Macfarlane will leave the NRC on Jan. 1st. She is resigning her chairmanship four years early. She only served for about two and a half years. Beyond Nuclear issued a statement when Macfarlane announced her resignation.

Thursday
Nov132014

Coalition presses case against reactors on Great Lakes

Lake Erie's shores are dotted with numerous large-scale atomic reactors and coal burners. These thermal-electric power plants dump 2/3rds of the heat they generate as waste into the environment, contributing to recent toxic algae blooms visible in this satellite photo.An environmental coalition, including Beyond Nuclear, is working at fever pitch against degraded old, and proposed new, reactors on the Great Lakes shoreline in southeast Michigan and northwest Ohio.

Davis-Besse, OH

At U.S. Nuclear Regulatory Commission (NRC) headquarters in Rockville, Maryland, the groups Beyond Nuclear, Citizens Environment Alliance of Southwestern Ontario (CEA), Don't Waste Michigan, and the Green Party of Ohio pressed their case against a 20-year license extension at FirstEnergy Nuclear Operating Company's problem-plagued Davis-Besse atomic reactor east of Toledo. An oral argument pre-hearing was ordered to take place on Nov. 12th by the NRC Atomic Safety and Licensing Board Panel (ASLBP) overseeing the License Renewal Application (LRA) proceeding. The coalition first intervented against the license extension nearly four years ago.

Attorney Terry Lodge, Beyond Nuclear's Kevin Kamps, and Don't Waste MI's Michael Keegan represented the coalition before NRC ASLBP. The coalition was joined by expert witness Arnie Gundersen, Chief Engineer of Fairewinds Associates, Inc. The focus of the day-long hearing was the severe, and worsening, cracking of Davis-Besse's concrete containment Shield Building. The dangerously deteriorating Shield Building is the last line of defense against a catastrophic release of hazardous radioactivity, as from a reactor core meltdown and Inner Steel Containment Vessel failure due to a reactor disaster, earthquake, tornado missile, etc. The coalition has filed numerous contentions about the cracking since it was first revealed on October 10, 2011.

The coalition issued a press advisory about the Nov. 12th oral hearing. The Toledo Blade has reported on this story.

Fermi 2, MI

Beyond Nuclear, CEA, and Don't Waste MI, again represented by Toledo-attorney Terry Lodge, will appear at oral argument pre-hearings before an NRC ASLB on November 20th in Monroe, Michigan. The coalition is opposing the 20-year license extension proposed at Detroit Edison's Fermi 2 atomic reactor in nearby Frenchtown Township, on the Lake Erie shore. Fermi 2 is the single biggest G.E. Mark I Boiling Water Reactor in the world -- the same design as melted down and exploded, times three, at Fukushima Daiichi, Japan.

Beyond Nuclear's Reactor Oversight Director, Paul Gunter, will argue a contention calling for radiological filters on hardened vents, an obviously needed safety upgrade actively ignored by a majority of the NRC Commissioners, despite the lessons that should have been learned from the Fukushima nuclear catastrophe. Beyond Nuclear's Freeze Our Fukushimas campaign calls for the shutdown of all U.S. Mark I and II reactors. (See Beyond Nuclear's Freeze Our Fukushimas pamphlet.)

Beyond Nuclear's Radioactive Waste Watchdog, Kevin Kamps, will argue a contention regarding serious safety risks associated with the Fermi nuclear power plant's off-site transmission line corridor, as well as radioactive waste contentions.

Another group, Citizens Resistance at Fermi Two (CRAFT), has launched another 15 contentions against the license extension.

Fermi 3, MI

The coalition comprised of Beyond Nuclear, Citizens for Alternatives to Chemical Contamination (CACC), CEA, Don't Waste MI, and the Sierra Club Michigan Chapter -- again represented by attorney Terry Lodge -- continues to press its case against the proposed new Fermi 3 reactor, to be built on the very site that the Fermi 1 "We Almost Lost Detroit"  reactor partially melted down on October 5, 1966.

The coalition intervened against Fermi 3 on March 9, 2009, and has since filed dozens of contentions against the proposal.

Its transmission line corridor NEPA (National Environmental Policy Act) contention is still before the NRC Commissioners, thanks to a sua sponte motion by the NRC ASLBP itself. On behalf of the coalition, Lodge just filed a motion with the NRC Commissioners, supporting the ASLBP's request to the Commissioners for permission to carry out its own independent review of what appears to be NRC staff violations of NEPA, for not including the required "hard look" at the environmental impacts of Fermi 3's transmission line corridor in the FEIS (Final Environmental Impact Statement).

In addition, the coalition has appealed the ASLBP's rejection of its quality assurance (QA) contention to the full NRC Commission. Arnie Gundersen of Fairewinds serves as the coalition's Fermi 3 QA expert witness. The NRC Commissioners will likely rule on the QA and transmission corridor contentions in the near future.

Friday
Nov072014

Environmental coalition cites lack of Nuclear Waste Confidence, calls for suspension of reactor licensing proceedings

An environmental coalition embroiled in numerous old, degraded reactor license extension -- as well as proposed new reactor construction and operation license -- proceedings has filed its "CONSOLIDATED REPLY TO ANSWERS TO PETITIONS TO SUSPEND FINAL REACTOR LICENSING DECISIONS, MOTIONS TO ADMIT A NEW CONTENTION, AND MOTIONS TO REOPEN THE RECORD" before the U.S. Nuclear Regulatory Commission (NRC).

The filing is a response to "Answers" filed a week ago by NRC staff and the nuclear utilities, as well as to an amicus curiae filing made by the Nuclear Energy Institute, the industry's lobbying arm in Washington, D.C. The environmental coalition's "Consolidated Reply" was prepared by Diane Curran of the Washington, D.C. law firm Harmon, Curran, Spielberg + Eisenberg, LLP, as well as Mindy Goldstein, Director of the Turner Environmental Law Clinic at Emory University School of Law in Atlanta.

Terry Lodge, a Toledo-based attorney who represents Beyond Nuclear and other environmental groups in their interventions against the Davis-Besse, OH and Fermi 2, MI license extensions, and the Fermi 3, MI Construction and Operating Licence Application (COLA), filed the "Consolidated Reply" in these proceedings.