Search
JOIN OUR NETWORK

     

     

 

 

ARTICLE ARCHIVE

Nuclear Power

Nuclear power cannot address climate change effectively or in time. Reactors have long, unpredictable construction times are expensive - at least $12 billion or higher per reactor. Furthermore, reactors are sitting-duck targets vulnerable to attack and routinely release - as well as leak - radioactivity. There is so solution to the problem of radioactive waste.

.................................................................................................................................................................................................................

Entries from September 1, 2015 - September 30, 2015

Saturday
Sep192015

Beyond Nuclear joins PowerDC at DC city hall rally to urge "No Deal!" on Exelon Nuclear's takeover of Pepco

Participants in the PowerDC rally against Exelon's takeover of Pepco took a group photo before marching to DC Mayor Muriel Bowwer's officeOn Sept. 17th, Beyond Nuclear staff joined with allies in the PowerDC coalition at the Wilson Building -- housing the Executive Office of the Mayor of Washington, D.C., Muriel Bowser -- to urge her to not cave to lobbyists' pressure from Exelon Nuclear of Chicago. The Washington City Paper and the Washington Post have reported on the rally.

Last month, the DC Public Service Commission (PSC) unanimously rejected Exelon's takeover of Mid-Atlantic utility Pepco, a ruling Mayor Bowser said she supported at that time. But, Exelon appears unwilling to take no for an answer. Exelon lobbyists have taken to back room deal making, as well as a high-priced ad campaign. In addition, the two companies will formally appeal the DC PSC decision by the Sept. 28th deadline, and have also threatened a lawsuit.

A link to exposés has been provided by Nuclear Energy Information Service of Chicago, a 34 year watchdog, on Exelon's nuclear misdeeds in IL and beyond.

PowerDC has a webform where you can take action, urging Mayor Bowser and DC City Council Members to stand firm, and not buckle under Exelon Nuclear's lobbying pressure! More.

Saturday
Sep122015

Cue up the bailout plea: Entergy might close aging FitzPatrick nuclear plant in New York State

Entergy's FitzPatrick atomic reactor (NRC file photo).The subject line above is Scott Stapf of the Hasting Group's Tweet pointing to an article at Syracuse.com. The dirty, age-degraded, dangerous, expensive, uncompetitive Fukushima Daiichi twin design (a General Electric Mark I Boiling Water Reactor) on the Lake Ontario shore in upstate NY (see photo), couldn't close a moment too soon!

Thursday
Sep032015

VOX: "This Ohio utility has an innovative plan to save coal power: force customers to buy it"

Should we laugh or cry? David Roberts has written an appropriately sarcastic, comprehensive review of FirstEnergy's attempt to gouge Ohio ratepayers to the tune of $3 billion over the next 15 years, to prop up its uncompetitive Davis-Besse atom-splitter on the Lake Erie shore, and its climate-fouling Sammis coal burner on the banks of the Ohio River.

Never mind that a decade ago, FirstEnergy lobbyists led the charge for "deregulation." Now, they're leading the charge for killing the competition (efficiency and renewables), as NIRS executive director Tim Judson has put it. And they're leading the charge for this ratepayer bailout. More.

Thursday
Sep032015

"Pilgrim nuclear station one step from shutdown: NRC downgrades plant to bottom of performance list"

As reported by Christine Legere at the Cape Cod Times, the U.S. Nuclear Regulatory Commission (NRC) has ranked Entergy's Pilgrim atomic reactor in Plymouth, MA near Boston as tied for the worst performing in the country.

It is tied for worst performing with another Entergy nuclear power plant, Arkansas Nuclear One (ANO). A young worker was killed, and eight others injured, on an early Easter Sunday morning in 2013, when a 600-ton piece of equipment was accidentally dropped on them.

As the article reports: Cape Downwinders has planned a rally at the Sagamore Bridge on Labor Day to protest the lack of an evacuation plan in the event of a nuclear accident and to call for the shutdown of the power plant.

Responding to the NRC's safety status downgrade, U.S. Senator Ed Markey (D-MA), a long time Pilgrim and nuclear power industry watchdog, pointed out that Pilgrim is identical in design to Fukushima Daiichi Units 1-4.

More.

Thursday
Sep032015

Just say no to nuclear subsidies: "FirstEnergy cannot call Davis-Besse power plant reliable"

A Beyond Nuclear letter to the editor just published at the Cleveland Plain Dealer begins:

To his credit, PUCO chair Andre Porter prioritized safety, in addition to reliability and cost, when it comes to Ohio's electricity supply ("PUCO Chair Andre Porter sees big changes coming for power companies," Plain Dealer, Aug. 30). FirstEnergy's Davis-Besse atomic reactor fails all three tests, but none more potentially catastrophically so than safety. More.