Please note: the U.S. Department of Energy (DOE) held a public comment proceeding that ended on Jan. 27, 2017, re: Private Initiatives for centralized interim storage of commercial irradiated nuclear fuel. As Waste Control Specialists, LLC's (WCS) scheme to construct and operate a centralized interim storage facility for commercial irradiated nuclear fuel in Andrews County, Texas is a private initiative, the previous comments to DOE, submitted on Jan. 27, can serve as sample talking points you can use to write your own public comments to the U.S. Nuclear Regulatory Commission (NRC) during this current environmental scoping public comment period. These public comments to NRC are due by March 13, 2017.
 
Here below are those comments previously submitted to DOE, that can now be used to write your own for submission to NRC (please be sure to substitute out DOE and substitute in NRC, and make any other changes to the comments below, to make them applicable to this NRC environmental scoping public comment period):
[See Beyond Nuclear's comments, as submitted to DOE on 1/23/17, in .doc format (with functional URLs embedded) and in .pdf format (embedded URLs do not work), that can now be used to prepare public comments to NRC.]
See DOE's dozen questions (in bold italics), followed by sample talking points you can now use to write your own public comments to NRC re: WCS [also see Additional sample talking points you can use to write your own public comments, below]:
As stated in its Request for Information (RFI), the U.S. Department of Energy (DOE) had requested:
In particular, DOE seeks information in the following [dozen] areas...
 
1. What key factors should be considered to ensure that  PIs, as part of the overall integrated nuclear waste management system,  would provide a workable solution for interim storage of spent nuclear  fuel and high-level waste?
Since a private centralized interim storage facility could easily become a de facto permanent  parking lot dump, or could one day well be targeted not just for  storage but also for permanent disposal (such a preference has been  expressed in related legislation on Capitol Hill, that the pilot-, and  full-scale, centralized interim storage site also be considered for  permanent disposal), the following criteria must be met: scientific  (geologic, hydrologic, etc.) site suitability; free, fully informed,  consent-based siting; environmental justice, not just for current, but also for all future generations. 
In addition, since consolidated interim storage would require  unprecedented numbers of shipments (by road, rail, and/or waterway) of  highly radioactive irradiated nuclear fuel, through many to most states,  such "Mobile Chernobyl" risks must be minimized. (See, for example, projected nationwide shipping routes to Yucca Mountain, Nevada,  which has been targeted for governmental (DOE) centralized interim  storage in the past, and is still targeted for permanent disposal; see  also projected cross-country shipping routes to the PI Waste Control Specialists, LLC facility in Andrews County, West Texas,  targeted for centralized interim storage.) Long-distance shipments  should only happen once, to suitable, consent-based, environmentally  just permanent disposal, not to a supposedly interim storage site, from  which the wastes will have to move again, multiplying transport risks.  Consent should be required for transport corridor communities for such  shipments, and transport container safety and security should be  guaranteed, requiring significant upgrades to current shipping container  integrity standards.
2. How could a PI benefit:
 
a. the local community and state or Tribe in which an ISF [Interim Storage Facility] is sited?
 
b. neighboring communities?
Certainly pro-nuclear Republican U.S. Senators, during related Energy  and Natural Resources Committee hearing in summer 2013, have joked  openly about the "incentives" (legalized bribes, and other  "inducements," such as promises of jobs, for low income, often people of  color communities; however, as Keith Lewis of the uranium mining and  milling devastated Serpent River First Nation of Ontario put it, "There  is nothing moral about tempting a starving man with money.") that cut to  the heart of tempting communities to consider "consenting" to "host" de facto permanent parking lot dumps. But what about the harms to communities, states, Tribes and neighboring communities that would be caused by de facto permanent parking lot dumps? 
For starters, low income people of color communities must be taken  off the target list, as a basic Environmental Justice principle. To do  otherwise would mean radioactive racism. Even people of color  communities which are no longer low income should not be targeted, given  the historical oppression they have already endured in the United  States. Neither should majority white low income communities be  targeted. 
Radioactive stigma impacts should be addressed and accounted for,  from the start. Even if a release of hazardous radioactivity into the  environment does not occur, property values will be significantly  decreased at and near a centralized interim storage site, as well as  along transport corridor routes. Radioactive stigma will even mean that  products from the area of the centralized interim storage facility will  be avoided by a significant share of consumers, causing economic losses.  So too would other economic development be deterred from the region of  the de facto permanent parking lot dump. 
And if a release of hazardous radioactivity does occur, the radioactive stigma impacts to the economy will be all the worse. 
Neighboring communities can expect to get the worst of both worlds.  The host community will reap the income, tax revenues, and jobs, while  neighboring communities will get the short end of the stick -- which  would include radioactive stigma impacts, but also the potential for  hazardous radioactivity release into air, surface waters, and  groundwaters if they happen to be located downwind and downstream. 
Native American "Tribes" -- Indigenous Nations -- should not be  targeted at all for such hazardous high-level radioactive waste storage  facilities. To the contrary, Indigenous Nations have been disproportionately targeted, for decades, an environmental injustice and form of radioactive racism. Beyond Nuclear and others pleaded with the Blue Ribbon Commission on America's Nuclear Future (BRC), from its opening meeting onwards, to no longer target Indigenous Nations. President Obama's Women's History Month, 2009 proclamation honoring Grace Thorpe of the Sauk and Fox Nation in Oklahoma for her work to stop centralized  interim storage sites targeted at her reservation community, and scores  more, was cited to the BRC. Such comments fell on deaf ears at the BRC,  and DOE is still targeting Indigenous Nations, to the present day. 
3. What type of involvement if any should the Department  [of Energy] or other federal agency consider having with the PI and the  community regarding organizational, structural, and contractural  frameworks and why?
Mention of "the Department or other federal agency" is an important reminder that  the DOE should not even be conducting this Request for Information proceeding.  The second highest recommendation by the BRC was for DOE to be removed from high-level radioactive waste management.  This  is because DOE has proven, over the course of decades, its incompetence  and worse -- that it cannot be trusted by the public, in such vital  matters.  Such  high-stakes matters as defining "consent-based siting" should be  carried out by a trustworthy and competent replacement for DOE. A  competent and trustworthy replacement for DOE would not have even  considered PIs for centralized interim storage, since this violates the  law, the Nuclear Waste Policy Act, as Amended. 
Re: contractual frameworks, of course the consequences of any  intentional wrongdoing, or even unintentional negligence, must be the  liability of the PI. Otherwise, as Tom "Smitty" Smith of Public  Citizen's Texas office has warned, this would "invite disaster because the private owners will be cutting costs at every turn to maximize profits." (See below under Additional sample talking points.) For  example, Waste Control Specialists (WCS) in Texas has baked-in the  contractual requirement, in its application for a license to construct  and operate a centralized interim storage site, that DOE would not only  hold title to the irradiated nuclear fuel, but would be entirely liable  should anything go wrong (such as an airborne release of hazardous  radioactivity, or a leak into the groundwater below, which could  contaminate the Ogallala Aquifer). This of course means U.S. taxpayers would bear ultimate liability, and pay all costs. The Price-Anderson Act already provides liability protection unique in industry -- but even that isn't good enough for WCS! To  remove all liability from a PI is a moral hazard with a radioactive  twist, inviting catastrophe through company short cuts on safety, to pad  their own pockets. 
And of course U.S. congressional committees of jurisdiction, as well  as Offices of Inspector General and Investigations, at all federal  agencies with jurisdiction (DOE, NRC, EPA, etc.), should all be fully  engaged, and do their jobs, to oversee and watchdog any centralized  interim storage proposals, during licensing, operations, and  decommissioning. Their duty, of course, is to protect public health,  safety, security, and the environment, as well as taxpayer pocketbooks,  not to cater to the nuclear power industry's or radioactive waste dumps'  lobbyists. 
4. What are the benefits and drawbacks of a PI, compared  to a federally-financed capital project resulting in a government-owned  contractor-operated (GOCO) interim storage facility?
As mentioned above under point #3, DOE's name is mud when it comes to radioactive waste management. This  includes GOCO endeavors such as the high-level radioactive waste liquid  vitrification plant at Hanford Nuclear Reservation, which is many years  behind schedule and billions of dollars over budget; as well as the  utter failure at the Mixed Oxide Fuel Fabrication Facility at Savannah  River Site, South Carolina, one of the worst boondoggles in DOE -- and  in fact U.S. federal government -- history. As  the BRC recommended as its second highest priority in its Final Report  in January 2012, DOE must be replaced with a competent, trustworthy  radioactive waste management federal agency. 
5. What assurances to the Government do you think would  be appropriate, to ensure that SNF [Spent Nuclear Fuel] stored at a  private ISF [Interim Storage Facility], would be managed effectively so  as to contain costs to the Government?
An important assurance would be, that hazardous radioactivity will not be released to the environment! No  current or foreseeable PI can make such an assurance. For example, at  WCS, NAC [Nuclear Assurance Corporation] dual-purpose storage/transport  containers would be used. But such NAC containers have exhibited major Quality Assurance [QA] violations, and other failures,  both historically dating back many decades (as documented in Dr. Marvin  Resnikoff's 1987 book "The Next Nuclear Gamble"), but also very  recently, as revealed at Chalk River Nuclear Lab in Ontario, Canada. Similarly,  Holtec transport/storage containers proposed to be used at the Eddy-Lea  [Counties] Energy Alliance in Hobbs, New Mexico have long exhibited  uncorrected QA violations, calling into question their structural  integrity while sitting still, let alone traveling 60 miles per hour or  faster on the railways, as revealed by industry and NRC whistle-blowers. 
Any contracts signed by DOE's replacement radioactive waste  management agency must be strictly fixed cost. Besides the multi-billion  dollar cost overruns, and years-long schedule delays, at Hanford and  SRS mentioned above, there is also the multi-billion dollar cost  overruns, and years-long schedule delays, at the Vogtle 3 & 4 new  reactor construction project in Georgia. DOE awarded Vogtle 3 & 4 a  whopping $8.3 billion federal loan guarantee, which means that U.S.  taxpayers will be left holding the bag for that full amount, if and when  the project defaults on its loan repayment. (In fact, such skyrocketing  cost overruns and compounding schedule delays are not only a decades-old pattern with  nuclear power plants and radioactive waste management facilities in the  U.S., including DOE projects, but the same is also true internationally;  remarkably, the public has been asked to bailout even 40+ year old,  uncompetitive atomic reactors across the U.S., at ratepayer expense, in  NY, IL, and perhaps even in Texas,  which is quite ironic, given WCS's lead in the race to open a PI  parking lot dump.) In short, any to-be-expected cost overruns should be  the responsibility of the PI, not of federal taxpayers.
Along similar lines, any PI should be required to be entirely  privately financed, not government financed, to protect federal  taxpayers' pocketbooks. 
6. What possibilities are there with respect to business  models for a PI, and what are the benefits and disadvantages of those  models?
A prior PI that should serve as a cautionary tale was the Private Fuel Storage, LLC (PFS) targeted at the Skull Valley Goshutes Indian Reservation in Utah. In addition to being a flagrant radioactive racism violation of environmental justice principles, PFS also serves as a warning about  how so-called interim surface storage facilities can turn into de facto  permanent parking lot dumps. PFS was proposed to have stored 40,000  metric tons of commercial irradiated nuclear fuel (the same amount as is  proposed at WCS, TX), in Holtec containers (the same model as proposed  by the Eddy-Lea Energy Alliance in NM). After  20 to 40 years of so-called "interim" storage (which is itself a very  long time to refer to as temporary or interim -- in fact, 40 years is  1/6th as long as the entire history of the United States thus far!), the  proposal was to then move the highly radioactive wastes to the  permanent burial dump at Yucca Mountain, Nevada. However, President  Obama wisely canceled the unsuitable, anti-consent-based, radioactively  racist and illegal (it is Western Shoshone Indian land by "peace and  friendship" treaty rights) Yucca dump in 2009-2010. Thus,  if PFS had opened, and irradiated fuel would have been moved there,  there would have been no Yucca dump to send it to after 20-40 years.  PFS's Plan B was "return to sender." Thus, 50+ Holtec casks from Maine  Yankee would have traveled 5,000-miles round-trip, accomplishing  absolutely nothing -- but putting countless millions in transport  corridor communities across the country at risk of "Mobile Chernobyls"  and "Mobile X-ray Machines That Can't Be Turned Off." Fortunately, despite NRC's high-risk rubber-stamp of the PFS construction and operation license, resistance (including that by the nationwide environmental justice movement, led by Native Americans) was strong enough to stop the parking lot dump from being built and opened. 
7. How could a PI manage liabilities that might arise during the storage period?
As mentioned in response to DOE questions #s 3. and 5. above, all  costs, liabilities, and risks should be borne by the PI companies  involved, not by the public. If the PI  companies are not willing to bear the burden of all liabilities involved  in the centralized interim storage scheme, this is a clear sign that  the proposal is too risky to undertake. To  undertake it nonetheless, at taxpayer liability (such as called for by  WCS in TX), would create a moral hazard with a highly radioactive twist! 
8. What state/local/tribal authorizations/approvals would be needed?
As mentioned at point #2. above, Native American -- and other low  income and people of color communities -- must be taken off the target  list to begin with, as a basic matter of environmental justice  principles. 
But in addition, any targeted so-called "Interim Storage Facility"  [ISF] location (including the transport corridor communities involved  nationwide) must incorporate free-, fully informed consent-based  principles, in addition to being scientifically suitable (geologically,  hydrologically, etc.) and geographically sensible (such as re: transport  risks; an example of regional inequity is the pattern of East dumping  on West -- 90% of the atomic reactors in the U.S. are in the eastern  half of the country, and yet all proposed parking lot dumps are in the  western half of the country). Such consent-based siting must extend from  the local level, to the county, regional, state, and national levels,  including all impacted residents and their elected officials at all  levels.
Any ISF PI must agree to bear the burden of full liability if  anything goes wrong, and must agree to pay all costs associated with the  facility -- not to burden the public (whether ratepayer or taxpayer)  with any of this.
9. How can the Government continue to explore or implement the PI concept in a fair, open and transparent manner going forward?
As mentioned in our response to DOE question #12. below, PI  centralized interim storage is illegal under the terms of the Nuclear  Waste Policy Act, as Amended. Thus, DOE should not go forward with this  private initiative proceeding, or any other, as to do so would violate  its legal authority. DOE should cease and desist from any further  exploration of the PI concept, and should certainly not enter into PI  contracts, as at WCS, TX.
Besides that, any undertaking of this significance should only happen  under the strictest terms of the National Environmental Policy Act  (NEPA), and also in compliance with the Atomic Energy Act (AEA) and  Administrative Procedures Act (APA). This current Request for  Information proceeding, by contrast, does not formally comply with NEPA,  just as DOE's 2016 "consent-based siting" public comment proceeding did  not comply with NEPA. This is unacceptable, and in fact illegal.
10. What, if any, supporting agreements might be expected  between the Government and the host state/tribe/local community  associated with a PI?
As mentioned in response to DOE's questions #3. and 7. above, all  liability must remain with the PI companies, not with the federal  taxpayer. And as mentioned in response to DOE's question #5. above, the  PI companies must meet fixed costs commitments; any cost overruns would  then be the private companies' problem, not DOE's (that is, not  taxpayers'). And again, DOE and its replacement radioactive waste  management agency must agree, once and for all, to stop targeting Native  American communities, as well as any other low income and/or people of  color community, for de facto permanent parking lot dumps. 
11. What other considerations should be taken into account?
Re: DOE's question #8. above, there is also the issue raised by  Allison Fisher of Public Citizen at  DOE's "kick off" meeting for  defining "consent-based siting," held in  Washington, D.C. in January  2016. What about future  generations? How  can current generations of decision makers doom all  future generations  to radioactive risks, by agreeing to "host" storage  and/or disposal  (as EPA has acknowledged in its Yucca Mountain  regulations, irradiated  nuclear fuel and high-level radioactive waste  has a million-year  hazard, which happens to be three times longer than Homo sapiens sapiens has even been a distinct species!). To this important question on  intergenerational equity and environmental justice, DOE gave no adequate  answer that day, nor has it since.
In addition, DOE must address the risk of so-called interim storage  becoming permanent parking lot-like surface storage. In its Final  Environmental Impact Statement (FEIS) for the proposed dump at Yucca  Mountain, Nevada, published in February 2002, DOE warned that permanent  abandonment of irradiated nuclear fuel on-site at the reactors where it  was generated would result in catastrophic releases of hazardous  radioactivity into the local environment, as dry casks failed over time.  DOE must admit, clearly and publicly, as in a PI centralized interim  storage EIS, that abandonment of irradiated nuclear fuel at a so-called  ISF (Interim Storage Facility) would likewise result, over long enough  periods of time, in dry cask failure, and catastrophic releases of  hazardous radioactivity into the environment.
Along those lines, this Request for Information proceeding is not  compliant with NEPA. DOE must publish a Draft EIS, allow for public  comment over an adequate period of time (we suggest a nine-month public  comment period), and hold multiple public hearings around the country  for the collection of public comment. Public meetings must be held by  the replacement agency for DOE in all proposed PI ISF "host communities"  -- such as Andrews County, TX; Culberson County, TX; Loving County, TX;  and Eddy-Lea Counties/Hobbs, New Mexico. So too must the state capitals  of states targeted for PI ISFs, including Austin, TX and Santa Fe, NM,  be granted an in-person meeting for public comments. And also the  biggest cities in each targeted state, including Dallas/Fort Worth,  Houston, etc. in TX, and Albuquerque in NM, be granted public comment  meetings. So too must public comment meetings be held in transportation  corridor communities across the country.
12. Are there any alternative approaches to developing  non-federally-owned facilities that might be proposed (e.g. how projects  would be financed, anticipated regulatory and legal issues, etc.). If  so, what are they, are there proposed solution [sic., solutions], and  how would the above questions be answered with respect to such  approaches?
PI centralized interim storage is illegal under the terms of the Nuclear Waste Policy Act, as Amended. [See the letter sent by Diane Curran, legal counsel for an environmental coalition, to   the U.S. Nuclear Regulatory Commission; see the coalition's press release; see additional information, including extensive media coverage.] No alternative approaches rectify this fatal flaw. For this reason alone, DOE should cease and desist from pushing it!
Additional sample talking points you can use to write your own public comments:
 1. As Tom "Smitty"  Smith of Public Citizen's Texas office has said, "Texans do not consent  to the risky plan to store high-level radioactive waste at private sites  on an open pad above ground in Texas. Another company near Hobbs, New  Mexico -- less than 50 miles away -- is expected to file an application  to open a storage site that would accept the rest of the nation's  high-level nuclear waste. These twin 'storage sites' likely would create  a de facto high-level national waste sacrifice zone. This proposal invites disaster because the private owners will be cutting costs at every turn to maximize profits. If there was radioactive contamination our land, air, water, and human health could be harmed for millennia." (emphasis added; see press release here)
2. Private permanent parking lot dumps are high-risk, not only  radiologically but also to U.S. taxpayers' pocketbooks. As Kevin Kamps  of Beyond Nuclear has said: "By requiring a permanent deep  geological repository to be operating before centralized interim storage  [whether private or federal government owned/operated], Congress wanted  to prevent the very real danger of a de facto permanent parking lot  dump -- a high-level radioactive waste storage site that would be  designed for the short-term but be there forever. WCS, for example, is a  cynical shell game and taxpayers are sure to lose. Congress was right  that liability for the costs for storing commercial irradiated nuclear  fuel belong with the generators and should not be shifted onto the backs  of the American public." (see press release)
3. Regarding the transportation costs and risks of centralized  interim storage (whether private or federal government owned/operated):
As Diane D'Arrigo, radioactive waste project director at Nuclear Information and Resource Service, has said, "Moving  irradiated nuclear fuel over roads, rails, and waterways to a  supposedly temporary site puts us all at risk and creates only the  illusion of a solution."
And as Karen Hadden, executive director of the Texas-based SEED  (Sustainable Energy & Economic Development) Coalition, has said, "Due  to risks of radioactive contamination from leaks or accidents or  potential terrorist actions, nuclear waste should only be moved once,  and only when a deep underground permanent repository is in place that  could safely isolate the dangerous waste for the million years [see immediately below] that it will remain hazardous." (see the press release)
In fact, a coalition of environmental groups, including NRDC, NIRS,  Nevada Nuclear Waste Task Force, Citizen Action Coalition of Indiana,  and Public Citizen, won a major court victory on July 9, 2004, which  ordered EPA back to the drawing board on its proposed Yucca Mountain  high-level radioactive waste dump regulatory cut-off at 10,000 years  post waste burial. In 2008, EPA's revised regulations acknowledged a one million year hazard associated with irradiated nuclear fuel and high-level radioactive  waste. (Truth be told, there are radioactive poisons in high-level  radioactive waste that will remain hazardous far longer than even a  million years. Iodine-129, as but one example, has a 15.7 million year  half-life. This means it will remain hazardous for 157 to 314 million  years!)
4. As the lead proposals for centralized interim storage (de facto permanent parking lot dumps) are private initiatives (in fact, there  are no proposed federal government owned/operated parking lot dumps),  all of the public comments submitted to DOE during its so-called  "consent-based siting" public comment period in 2016 still apply. (The  lead private initiative is by Waste Control Specialists, LLC in Andrews  County, West Texas, followed by the Eddy-Lea [Counties] Energy Alliance  in Hobbs, New Mexico (less than 50 miles from WCS); AFCI in Loving  County, TX; and Culberson County, TX. Note that not  only WCS, but also AFCI, have close connections to Trump's pick for  Energy Secretary, former TX governor Rick Perry, representing a blatant  conflict of interest and ethical violation.) Comments submitted by  environmental, public interest, and other NGOs can and should be  submitted again during this current comment period (especially  considering the fact that DOE largely to entirely ignored these comments  when it issued its draft and final reports on defining "consent-based  siting"!). See those comments by the following groups, and use them to  write your own: several sets of comprehensive Beyond Nuclear comments, covering various subject matter, including Environmental Justice; Beyond Nuclear's Top 10 List, as well as its more detailed 2-page, and even more detailed 13-page, versions of sample comments;  Alliance for Nuclear Accountability (ANA); Fairewinds Energy Education; Institute for Energy and Environmental Research (IEER); Natural Resources Defense Council (NRDC); Nuclear Information and Resource Service (NIRS); Public Citizen; and a collection of comments from groups such as SEED Coalition, NAWO, Pilgrim Watch, and others.